The eastbound Park Boulevard Bridge will be reduced to one lane between Gulf Boulevard and Danielle Court.
The city of Treasure Island City Commission has passed an amendment to its ordinance regulating these new "micromobility" devices.
Work continues on the Treasure Island Causeway Bascule Bridge to correct errors with the programmable logic controllers and wiring.
“I am thrilled to know that the community has welcomed the SunRunner with open arms,” said Brad Miller, chief executive officer of PSTA.
The first-of-its-kind SunRunner will start service at 6 a.m. on Friday, Oct. 21.
Pinellas County Utilities will repair and replace a sanity sewer manhole and pipe at 399 Tom Stuart Causeway.
The SunRunner will be up and running next month, allowing residents to get to the beach without having to drive.
The SunRunner will include 30 stations, with buses running every 15 minutes during the day and every 30 minutes in the evening.
Drivers can expect a five- to 10-minute delay between 116th Avenue and 112th Avenue during busy driving hours.
On June 24 and 25, the inside eastbound lane of the East Causeway will be closed periodically to finish the installation.
On June 17 and 18, the inside westbound lane of the East Treasure Island Causeway will be closed from 7 a.m. to 5 p.m.
After more than two years of construction, workers put the first beam of the new Howard Frankland Bridge Structure in place.
The city of St. Pete Beach has announced a temporary lane reduction on the Corey Causeway bridge until Nov. 11.
The construction contractor for the long-awaited East Causeway Roadway and Drainage Improvements Project will begin work the week of Nov. 8.
Many drivers are unaware of a newly enacted Move Over Law for bicyclists that might have saved the life of a 60-year-old mother of two.
The lanes will remain closed from 9 a.m. to 5 p.m. through Friday, Sept. 18.
The ramp from southbound U.S. 19 to Bryan Dairy Road/118th Avenue North is scheduled to permanently close this week.
The St. Pete Beach City Commission is the first to adopt a resolution to work with Forward Pinellas toward a goal of zero deaths by 2045.
With a dramatic underwater explosion, the Florida Department of Transportation kicked off the Pinellas Bayway Bridge replacement project.
The funding supports innovative solutions that use cutting-edge technologies to improve mobility and safety.
The FDOT is working with the project contractor to reschedule the operation.
Motorists will need to use alternate routes, including Gandy Bridge and Courtney Campbell Causeway.
All Interstate 275 travel lanes on the Howard Frankland Bridge will close from 8 p.m. Saturday, Jan. 9 to noon Sunday, Jan. 10.
The St. Pete Beach access parking lot will be closed Dec. 14-16 to perform construction on the Sunrunner train station.
Pinellas County is set begin work on an intersection and sidewalk improvement project on 131st Street North.
U.S. Rep. Charlie Crist (D-FL) presented another $1.2 million grant to Pinellas Suncoast Transit Authority to develop the SunRunner.
Work will begin Aug. 10 on a sidewalk and roadway upgrade between Edgewater Drive and the Pinellas Trail in Clearwater.
A virtual city commission work session for the Indian Rocks Beach Gulf Boulevard Visioning study will take place Aug. 11.
CSX Transportation will perform maintenance at multiple railroad crossings starting later this month.
Southern Commercial Development LLC will be working with CSX Transportation on necessary maintenance.
President Donald Trump announced Friday that the U.S. DOT has committed $21.8 million to provide bus service to Pinellas beaches.
The Pinellas County Commission gave the go-ahead on two projects that will bring significant transportation improvements.
The repair work is scheduled to be completed by Jan. 15.
Starting Monday, 82nd Avenue will be closed between 60th Street and 66th Street to through-traffic for sewer repairs.
The City of Pinellas Park has announced that, effective Sept. 16, 82nd Avenue will be closed between 60th Street and 66th Street.
he City of Pinellas Park is advising drivers that 77th Avenue between 56th Street and 57th Street will be closed from Feb. 26 to March 12.
Northbound traffic on Oakhurst Road in Seminole will be diverted through Wednesday, Jan. 16 due to a broken 8-inch sewer main.
Motorists traveling on Starkey Road/Park Street on either side of the Park Boulevard intersection in Seminole may experience daytime delays.
The City of Pinellas Park is making modifications on 76th Avenue from Railroad Way to 58th Street to turn 76th into a one-way road.